Rigid Insulation Roof Voer Decking
Rigid insulation layers exterior to existing roof sheathing must provide sufficient thermal insulation r value to control condensation risk see climate specific guidance.
Rigid insulation roof voer decking. After the roof deck is ready the rigid foam insulation is installed. Both install in the same manner but the foil faced product offers slightly more r value. The purpose of the requirement that rigid foam installed above roof sheathing meet certain minimum r values is to ensure that the roof sheathing stays warm enough during the winter to avoid moisture accumulation and possible sheathing rot. This air seal is pretty darn good.
Depending on the type of insulation you choose and the desired r value you want for your facility you may need to build up a few layers of insulation. Foamular xps insulation is a rigid foam insulation which meets the needs of today s design professionals for a truly sustainable insulation product. The three layers of rigid insulation have yet to be installed over the top of the roof decking at this point. Polystyrene foam and foil faced polyisocyanurate foam.
Install rigid insulation board in multiple layers with joints offset vertically and horizontally between adjacent layers. The r value is a measurement of the heat loss and heat gain. We re proud to say our products can be found in some of the tallest and safest buildings around the globe like salesforce tower. Most unvented attics incorporate spray polyurethane foam spf on the underside of the roof deck and attic walls.
Install nailbase for cladding. An excellent fire barrier densdeck roof boards feature a noncombustible core and inorganic surface that offer greater fire protection than other conventional commercial roofing products when applied over combustible roof decks and steel decks. This construction approach was first used in the 1970s and it has been implemented much more widely since it was first included in the international code council s icc model building code in 2007 irc section 806 4. Case study salesforce tower.
It is an acceptable practice to install a new roof over an existing roof membrane system provided that the roof deck is structurally sound and has been properly prepared to support the added load. With a minimum of 70 recycled content the installed thermafiber products contributed to valuable leed credits helping the building earn a leed platinum certification.